{"id":1125,"date":"2012-08-13T10:24:40","date_gmt":"2012-08-13T09:24:40","guid":{"rendered":"http:\/\/lizburton.co.uk\/wordpress\/?p=1125"},"modified":"2013-04-04T16:47:20","modified_gmt":"2013-04-04T15:47:20","slug":"no-so-grand-designs-part-3","status":"publish","type":"post","link":"http:\/\/lizburton.co.uk\/wordpress\/everyday-stuff\/no-so-grand-designs-part-3\/","title":{"rendered":"No So Grand Designs Part 3"},"content":{"rendered":"<p><a title=\"No So Grand Designs Part 1\" href=\"http:\/\/lizburton.co.uk\/wordpress\/everyday-stuff\/no-so-grand-designs-part-1\/\">Part 1 is here.<\/a><\/p>\n<p><a title=\"Not So Grand Designs Part 2\" href=\"http:\/\/lizburton.co.uk\/wordpress\/everyday-stuff\/not-so-grand-designs-part-2\/\">Part 2 is here.<\/a><\/p>\n<p>By the beginning of August 2012 the concrete has been poured into the footings, the below ground block work done, the slab poured and block work is starting to rise above ground.<\/p>\n<figure id=\"attachment_1129\" aria-describedby=\"caption-attachment-1129\" style=\"width: 550px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" class=\"size-full wp-image-1129\" title=\"The blockwork to the utility room and porch starts to go up\" alt=\"The blockwork to the utility room and porch starts to go up\" src=\"http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/blockwork.jpg\" width=\"550\" height=\"367\" srcset=\"http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/blockwork.jpg 550w, http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/blockwork-300x200.jpg 300w, http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/blockwork-449x300.jpg 449w\" sizes=\"(max-width: 550px) 85vw, 550px\" \/><figcaption id=\"caption-attachment-1129\" class=\"wp-caption-text\">The block work to the utility room and porch starts to go up<\/figcaption><\/figure>\n<figure id=\"attachment_1130\" aria-describedby=\"caption-attachment-1130\" style=\"width: 550px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" class=\"size-full wp-image-1130\" title=\"The sun room also starts to rise from the ground.\" alt=\"The sun room also starts to rise from the ground.\" src=\"http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/blockwork2.jpg\" width=\"550\" height=\"367\" srcset=\"http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/blockwork2.jpg 550w, http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/blockwork2-300x200.jpg 300w, http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/blockwork2-449x300.jpg 449w\" sizes=\"(max-width: 550px) 85vw, 550px\" \/><figcaption id=\"caption-attachment-1130\" class=\"wp-caption-text\">The sun room also starts to rise from the ground; note the 80mm of insulation.<\/figcaption><\/figure>\n<figure id=\"attachment_1131\" aria-describedby=\"caption-attachment-1131\" style=\"width: 550px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" class=\"size-full wp-image-1131\" title=\"New drain runs for surface and foul water\" alt=\"New drain runs for surface and foul water\" src=\"http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/drains.jpg\" width=\"550\" height=\"367\" srcset=\"http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/drains.jpg 550w, http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/drains-300x200.jpg 300w, http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/drains-449x300.jpg 449w\" sizes=\"(max-width: 550px) 85vw, 550px\" \/><figcaption id=\"caption-attachment-1131\" class=\"wp-caption-text\">New drain runs are installed for surface and foul water.<\/figcaption><\/figure>\n<p>Meanwhile inside the original bathroom floor for some inexplicable reason was finished above the height of the bedroom floor. This means that the bathroom floor needs to be broken up to lay a new slab at the correct height. It turns out to be fortuitous as the subfloor is full of water from a leaking pipe.<\/p>\n<figure id=\"attachment_1132\" aria-describedby=\"caption-attachment-1132\" style=\"width: 550px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" class=\"size-full wp-image-1132\" title=\"Meanwhile inside we 'Kango' up the bathroom floor\" alt=\"Meanwhile inside we 'Kango' up the bathroom floor\" src=\"http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/kango.jpg\" width=\"550\" height=\"367\" srcset=\"http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/kango.jpg 550w, http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/kango-300x200.jpg 300w, http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/kango-449x300.jpg 449w\" sizes=\"(max-width: 550px) 85vw, 550px\" \/><figcaption id=\"caption-attachment-1132\" class=\"wp-caption-text\">Meanwhile inside we &#8216;Kango&#8217; up the bathroom floor and deposit the concrete in what was our bedroom. Note the new steel joist.<\/figcaption><\/figure>\n<figure id=\"attachment_1236\" aria-describedby=\"caption-attachment-1236\" style=\"width: 550px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" class=\"size-full wp-image-1236\" title=\"The Roof to the Sunroom Starts to Take Shape\" alt=\"Roof Construction\" src=\"http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/roof_const.jpg\" width=\"550\" height=\"367\" srcset=\"http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/roof_const.jpg 550w, http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/roof_const-300x200.jpg 300w, http:\/\/lizburton.co.uk\/wordpress\/wp-content\/uploads\/2012\/08\/roof_const-449x300.jpg 449w\" sizes=\"(max-width: 550px) 85vw, 550px\" \/><figcaption id=\"caption-attachment-1236\" class=\"wp-caption-text\">The Roof to the Sunroom Starts to Take Shape<\/figcaption><\/figure>\n<p style=\"text-align: center;\">\n<p><a title=\"No So Grand Designs Part 4\" href=\"http:\/\/lizburton.co.uk\/wordpress\/everyday-stuff\/no-so-grand-designs-part-4\/\">Part 4 is Here<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Part 1 is here. Part 2 is here. By the beginning of August 2012 the concrete has been poured into the footings, the below ground block work done, the slab poured and block work is starting to rise above ground. Meanwhile inside the original bathroom floor for some inexplicable reason was finished above the height &hellip; <a href=\"http:\/\/lizburton.co.uk\/wordpress\/everyday-stuff\/no-so-grand-designs-part-3\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;No So Grand Designs Part 3&#8221;<\/span><\/a><\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0},"categories":[54,4],"tags":[70],"_links":{"self":[{"href":"http:\/\/lizburton.co.uk\/wordpress\/wp-json\/wp\/v2\/posts\/1125"}],"collection":[{"href":"http:\/\/lizburton.co.uk\/wordpress\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/lizburton.co.uk\/wordpress\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/lizburton.co.uk\/wordpress\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/lizburton.co.uk\/wordpress\/wp-json\/wp\/v2\/comments?post=1125"}],"version-history":[{"count":13,"href":"http:\/\/lizburton.co.uk\/wordpress\/wp-json\/wp\/v2\/posts\/1125\/revisions"}],"predecessor-version":[{"id":1157,"href":"http:\/\/lizburton.co.uk\/wordpress\/wp-json\/wp\/v2\/posts\/1125\/revisions\/1157"}],"wp:attachment":[{"href":"http:\/\/lizburton.co.uk\/wordpress\/wp-json\/wp\/v2\/media?parent=1125"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/lizburton.co.uk\/wordpress\/wp-json\/wp\/v2\/categories?post=1125"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/lizburton.co.uk\/wordpress\/wp-json\/wp\/v2\/tags?post=1125"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}